Evaluate movement
Before pricing, inspect substrate stiffness, cracks, joints and transitions before choosing tile size or setting method for the Bend property. Require deflection information, crack map and substrate notes; connect it to the same written scope every bidder receives. Deschutes County Building Safety and the responsible trade authorities should answer project-specific jurisdiction questions before work is represented as permit-free. That record allows the owner compare labor boundaries, materials, sequencing, protection and closeout on equal terms. When omitted, rigid finishes reveal movement that resilient flooring can tolerate. Ask the contractor to identify assumptions, exclusions and the exact evidence that will prove this part complete.