Does concrete work need a Bend permit?expand_more
Some structural, site and right-of-way work does. Confirm the address and exact scope with Bend before excavation or placement.
How should base preparation be written?expand_more
State excavation depth, material, lift placement, compaction method and acceptance evidence.
How do I compare concrete bids?expand_more
Give every bidder the same dimensions, grades, load, base, reinforcement, joint, finish and restoration requirements.
How should unknown soil be handled?expand_more
Use a bounded investigation or qualified recommendation and require written approval before extra excavation expands.
What should be documented before a pour?expand_more
Verify forms, elevations, base, reinforcement, sleeves, joints, access and required inspections with photographs or records.
How should weather delays work?expand_more
Use current material requirements and state placement, protection, curing and schedule decision responsibility.
How do I verify a Bend contractor?expand_more
Match the legal business and active license, bond, insurance and history through Oregon CCB.
What belongs in closeout?expand_more
Collect permits, inspections, product records, reinforcement photos, changes, drainage checks, care guidance and warranties.