Who reviews La Pine solar permits?expand_more
Confirm the property and design with Deschutes County Building Safety and the applicable electrical authority.
Does solar always require a panel upgrade?expand_more
No. Require a documented capacity assessment and design basis.
Who may perform electrical work?expand_more
Use appropriately licensed Oregon electrical businesses and workers.
Should roof condition be checked first?expand_more
Yes. Coordinate remaining roof work, attachments, flashing and warranties before installation.
How should future loads be handled?expand_more
List planned vehicles, heat pumps or other loads and include them explicitly in the design assumptions.
What should monitoring handoff include?expand_more
Provide owner access, equipment identifiers, alerts and a production baseline.
What happens before equipment ordering?expand_more
Complete design assumptions, review dependencies and compatibility decisions for nonreturnable products.
What belongs in closeout?expand_more
Keep permits, inspections, drawings, models, serials, tests, photos and warranties.